ØQUANTITATIVE
PROJECT MANAGEMENT
ØCapability
Maturity Model Integrated (CMMI)
üStaged Representation Maturity Level 4
üContinuous Representation w/ QPM / OPP as required PA’s
ØMy
DoD policy proposal
üRequire PM’s to perform a thorough program risk analysis
üSelect PA’s based upon risk results
üMake QPM / OPP required PA’s